What the New Federal Act Means to California
for the 21st Century |
Figure 11 | ||||
TEA 21 High Priority Projects in California |
||||
1998
Through 2004 (Dollars in Millions) |
||||
Counties | Description | Amount | Project Costs | Percent of Project Funded |
Solano - Contra Costa -Alameda-Santa Clara | Construct capital improvements along I-680 corridor | $2.3 | $6.3 | 36% |
Butte / Yuba | Improve SR 70 from Marysville Bypass to Oroville Freeway | 6.3 | 172.0 | 4 |
San Francisco - Marin | Seismic retrofit of Golden Gate Bridge | 26.8 | 317.0 | 8 |
Los Angles / Orange | Construct I-5 rail grade crossings between I-605 and State Route 91, Los Angeles and Orange Counties | 15.1 | 25.2 | 60 |
Alameda | Upgrade I-880, Alameda | 7.5 | 12.5 | 60 |
Alameda | Upgrade I-680 Corridor, Alameda County | 7.5 | 53.0 | 14 |
Alameda | Construct railroad at-grade crossings, San Leandro | 0.4 | 0.6 | 60 |
Alameda | Construct Port of Oakland intermodal terminal | 6.0 | 150.0 | 4 |
Alameda | Upgrade Osgood Road between Washington Boulevard and South Grimmer Boulevard, Fremont | 1.5 | 2.5 | 60 |
Alameda | Upgrade Greenville Road and construct railroad underpass, Livermore | 5.1 | 8.5 | 60 |
Alameda | Undertake median improvements along E. 14th Street, San Leandro | 0.8 | 1.0 | 75 |
Alameda | Rehabilitate B Street between Foothill Boulevard and Kelly Street, Hayward | 0.5 | ||
Alameda | Construct I-580 interchange, Livermore | 9.9 | 60.0 | 17 |
Alameda | Upgrade Industrial Parkway Southwest between Whipple Road and improved segment of the parkway, Hayward. | 0.5 | 0.8 | 60 |
Contra Costa | Upgrade Route 4 West in Contra Costa County | 7.5 | 32.8 | 23 |
Contra Costa | Upgrade Route 4 East in Contra Costa County | 8.5 | 15.5 | 55 |
Contra Costa | Construct I-680 HOV lanes between Marina Vista toll plaza to North Main Street, Martinez to Walnut Creek | 5.3 | 25.3 | 21 |
Del Norte | Stabilize U.S. 101 at Wilson Creek | 0.7 | 42.7 | 2 |
Del Norte | Design and initiation of long term improvements along Highway 199 in Del Norte County | 0.3 | 49.8 | 1 |
Fresno | Construct extension of State Route 180 between Route 99 and the Hughes/West Diagonal | 6.0 | 30.0 | 20 |
Humboldt | Improve highway access to Humboldt Bay and Harbor Port. | 0.3 | 0.6 | 44 |
Humboldt | Upgrade U.S. 101 from Eureka to Arcata | 0.7 | 20.0 | 3 |
Imperial | Extend State Route 7 in Imperial County | 6.0 | 46.4 | 13 |
Kern | Construct Centennial Transportation Corridor | 15.8 | 300.0 | 5 |
Lake | Widen State Route 29 between Route 281 and Route 175 | 0.3 | 10.2 | 3 |
Los Angeles | Extend I-10 High Occupancy Vehicle lanes, Los Angeles | 2.2 | 155.0 | 1 |
Los Angeles | Improve streets and construct bicycle path, Westlake Village | 0.2 | 0.2 | 139 |
Los Angeles | Improve streets and construct bicycle path, Calabasas | 0.8 | 0.8 | 91 |
Los Angeles | Widen and improve I-5/State Route 126 interchange in Valencia | 10.4 | 17.4 | 60 |
Los Angeles | Construct Alameda Corridor East project | 9.6 | 16.7 | 57 |
Los Angeles | Upgrade access to Sylmar/San Fernando Metrolink Station and Westfield Village, Los Angeles | 0.4 | 0.6 | 60 |
Los Angeles | Construct grade separation project at Redondo Junction, located in the North end of an Intermodal corridor of economic significance, as defined by California Streets and Highways Code, Division 3, Chapter 4.7 (commencing with section 2190), Los Angeles | 6.6 | ||
Los Angeles | Upgrade CA Route 2 Southern Freeway terminus and transportation efficiency improvements to Glendale Boulevard in Los Angeles | 12.0 | 20.0 | 60 |
Los Angeles | Construct Palisades Bluff Stabilization project, Santa Monica | 6.0 | ||
Los Angeles | Construct the South Central Los Angeles Exposition Park Intermodal Urban Access Project in Los Angeles | 19.5 | 32.5 | 60 |
Los Angeles | Construct Nogales St. at Railroad Street grade separation in Los Angeles Co. | 6.5 | 5.6 | 116 |
Los Angeles | Construct Los Angeles County Gateway Cities NHS Access | 6.6 | 10.9 | 60 |
Los Angeles | Reconstruct and widen Mission Road, Alhambra | 2.4 | 17.6 | 14 |
Los Angeles | Rehabilitate Artesia Boulevard | 3.0 | 5.0 | 60 |
Los Angeles | Implement safety and congestion mitigation improvements along Pacific Coast Highway, Malibu | 0.6 | 1.8 | 36 |
Los Angeles | Construct Ocean Boulevard and Terminal Island Freeway interchange in Long Beach, California | 15.0 | 25.0 | 60 |
Los Angeles | Create recreational trails in Santa Monica Mountains National Recreation Area | 6.0 | ||
Los Angeles | Construct bike path between Sepulveda Basin Recreation Area and Warner Center/Canoga Park, Los Angeles | 1.9 | 3.8 | 50 |
Los Angeles | Construct Phase 3 of Alameda Street project, Los Angeles | 2.5 | 7.5 | 33 |
Los Angeles | Improve streets and construct bicycle paths, Agoura Hills | 0.6 | ||
Los Angeles | Implement City of Compton traffic signal systems improvements | 3.8 | 5.8 | 65 |
Los Angeles | Improve roadway to provide access to Hansen Dam Recreation Area in Los Angeles | 0.8 | 1.3 | 60 |
Los Angeles | Construct improvements to Harry Bridges Boulevard, Los Angeles | 6.5 | 30.0 | 22 |
Los Angeles | Improve the Avenue H overpass in Lancaster | 4.6 | 7.6 | 60 |
Los Angeles | Improve streets in Canoga Park and Reseda areas, Los Angeles | 1.0 | 1.4 | 73 |
Los Angeles | Construct Alameda Corridor East, San Gabriel Valley | 2.2 | 3.7 | 60 |
Los Angeles | Upgrade and synchronize traffic lights in the Alameda Corridor East in Los Angeles County | 17.3 | 28.8 | 60 |
Los Angeles | Upgrade Del Almo Boulevard at I-405 | 5.0 | 5.0 | 100 |
Los Angeles | Reconstruct La Loma Bridge in Pasadena | 2.3 | 3.8 | 60 |
Los Angeles | Reconstruct Palos Verdes Drive, Palos Verdes Estates | 0.4 | 0.6 | 60 |
Los Angeles | Reconstruct the I-710/Firestone Blvd. interchange | 12.0 | 20.0 | 60 |
Los Angeles | Construct Arbor Vitae Street improvements, Inglewood | 2.6 | 4.4 | 60 |
Los Angeles | Implement ITS technologies in Employment Center area of City of El Segundo | 2.7 | 4.4 | 60 |
Los Angeles | Construct Santa Monica Transit Parkway | 17.0 | ||
Los Angeles | Construct highway grade separation/other improvements for ``Gateway for America" project in San Gabriel Valley | 100.0 | ||
Madera | Extend Highway 41 in Madera County | 5.5 | 12.5 | 44 |
Marin | Reconstruct Tennessee Valley Bridge, Marin County | 0.8 | 1.3 | 60 |
Marin | Modify HOV lanes, Marin County | 5.3 | 45.5 | 12 |
Mendocino | Enhance Fort Bragg and Willets passenger stations | 0.3 | 1.3 | 21 |
Mendocino | Willits Bypass, Highway 101 in County, California | 0.7 | 26.6 | 2 |
Merced | Construct UC Campus Parkway Loop System in Merced | 11.0 | 90.0 | 12 |
Monterey | Undertake safety enhancements along Monterey County Railroad highway grade, Monterey County | 2.1 | 3.5 | 60 |
Monterey | Construct Prunedale Bypass segment of U.S. 101, Monterey County | 1.7 | 206.4 | 1 |
Monterey | Construct Airport Boulevard interchange in Salinas | 6.0 | 22.0 | 27 |
Napa | Replace Maxwell Bridge, Napa County | 8.7 | ||
Orange | Construct parking lot, pedestrian bridge and related improvements to improve intermodal transportation in Yorba Linda | 1.0 | 4.8 | 21 |
Orange | Upgrade Bristol Street, Santa Ana | 5.3 | 8.8 | 60 |
Orange | Improve State Route 57 interchange at Lambert Road in Brea | 1.0 | 1.3 | 80 |
Orange | Construct I-5/Avenida Vista Hermosa interchange in San Clemente | 2.3 | 3.8 | 60 |
Orange | Reconstruct Harbor Boulevard/SR22 Interchange, City of Garden Grove | 1.5 | 2.5 | 60 |
Orange | Construct Gene Autry Way/I-5 Access project, Anaheim | 6.8 | 11.3 | 60 |
Orange | Construct Imperial Highway grade separation and sound walls at Esperanza Road/Orangethorpe Avenue in Yorba Linda | 12.5 | 17.1 | 73 |
Orange | Construct Cabot-Camino Capistrano Bridge project in Southern Orange County | 1.5 | 2.5 | 60 |
Placer | Improve and widen Forest Hill Road in Placer County | 2.7 | 15.0 | 18 |
Riverside | Improve SR 91/Green River Road interchange | 4.9 | 8.1 | 60 |
Riverside | Improve the interchange at Cabo Moreno Valley | 4.5 | 7.5 | 60 |
Riverside | Realign and improve California Route 79 in Riverside County | 4.5 | 18.6 | 24 |
Riverside | Construct interchanges for I-10 in Coachella Valley, Riverside County | 2.3 | 3.8 | 60 |
Riverside | Widen SR 71 from Riverside County to SR 91 | 13.0 | 16.3 | 80 |
Riverside | Construct Overland Drive overcrossing in Temecula | 3.8 | 11.1 | 34 |
Riverside | Construct I-15 Galinas interchange in Riverside County | 6.4 | 14.3 | 45 |
Riverside | Construct March Inland Port ground access project, Riverside County | 7.2 | ||
Sacramento | Improve Folsom Boulevard--Highway 50 in the City of Folsom | 4.3 | 10.0 | 43 |
Sacramento | Extend 7th Street between F Street and North 7th Street, Sacramento | 1.5 | 7.0 | 21 |
Sacramento | Upgrade intersection of Folsom Boulevard and Power Inn Road, Sacramento | 7.5 | 30.0 | 25 |
Sacramento | Construct Sacramento Intermodal Station | 3.0 | 20.0 | 15 |
San Bernardino | Reconstruct State Route 81 (Sierra Avenue) and I-10 Interchange in Fontana | 7.5 | 23.5 | 32 |
San Bernardino | Improve Mission Boulevard in San Bernardino, California | 0.5 | 10.6 | 5 |
San Bernardino | Rehabilitate historic train depot in San Bernardino | 2.6 | 4.4 | 60 |
San Bernardino | Upgrade Ft. Irwin Road from I-15 to Fort Irwin | 1.1 | 1.9 | 60 |
San Bernardino | Reconstruct I-215 and construct HOV lanes between 2nd Street and 9th Street, San Bernardino | 2.1 | 3.4 | 60 |
San Bernardino | Construct I-10/Pepper Avenue Interchange | 6.6 | 11.0 | 60 |
San Bernardino | Widen I-15 in San Bernardino County | 18.0 | 70.7 | 26 |
San Bernardino | Widen 5th Street and replace 5th Street bridge in Highland, California | 0.8 | 1.3 | 60 |
San Bernardino | Construct interchange between I-15 and Main Street in Hesperia, California | 7.5 | 17.3 | 44 |
San Bernardino | Plan, design and construct interchange between I-15 and Sante Fe Road in Barstow | 3.0 | 4.0 | 75 |
San Bernardino | Construct I-10/Barton Road West/Anderson Street connection | 3.8 | 6.3 | 60 |
San Bernardino | Implement enhanced traffic access between I-10, area hospitals and southern portion of Loma Linda | 1.5 | 2.5 | 60 |
San Bernardino | Upgrade Riverside Avenue/I-10 interchange, Rialto | 0.7 | 11.7 | 6 |
San Bernardino | Construct I-10 Tippecanoe/Anderson interchange project in Loma Linda and San Bernardino County | 1.5 | 19.1 | 8 |
San Bernardino | Construct interchange between I-15 and SR 18 in Victorville/Apple Valley | 6.0 | 10.0 | 60 |
San Bernardino | Conduct planning, preliminary engineering and design for Etiwanda Avenue/I-10 interchange, San Bernardino County | 1.5 | 2.5 | 60 |
San Diego | Construct San Diego and Arizona Eastern Intermodal Yard, San Ysidro | 10.0 | 20.0 | 50 |
San Diego | Construct State Route 76 in Northern San Diego | 7.5 | 113.0 | 7 |
San Diego | Construct SR 78/Rancho Del Oro interchange in Oceanside | 3.8 | 13.8 | 27 |
San Diego | Construct State Route 905 between I-805 and the Otay Mesa Border Crossing, San Diego County | 16.0 | ||
San Diego | Improve Rancho Sante Fe Road in Carlsbad | 2.3 | 7.2 | 31 |
San Diego | Construct State Route 56 North connectors at I-5 and North and South connectors at I-15 in San Diego | 3.0 | 90.9 | 3 |
San Diego | Complete Citraeado Parkway project in San Diego County | 2.3 | 12.0 | 19 |
San Diego | Construct Olympic Training Center access road, Chula Vista | 5.0 | 12.0 | 42 |
San Diego | Extend State Route 52 in San Diego | 2.3 | 1.8 | 129 |
San Diego | Construct State Route 905 between I-805 and Otay Mesa border crossing | 38.5 | ||
San Francisco | Construct Third Street South Bay Basin Bridge, San Francisco | 9.4 | 15.6 | 60 |
San Francisco | Construct San Francisco Regional Intermodal Terminal. | 9.4 | 130.0 | 7 |
San Francisco / Marin | Seismic retrofit of Golden Gate Bridge | 26.8 | 317.0 | 8 |
San Joaquin | Improve Route 99/Route 120 interchange in Manteca | 6.0 | 10.0 | 60 |
San Luis Obispo | Construct pedestrian boardwalk between terminus of Pismo Promenade at Pismo Creek and Grande Avenue in Grover Beach | 0.4 | 1.7 | 22 |
San Luis Obispo | Implement traffic management improvements, Grover Beach | 0.4 | 1.0 | 38 |
San Luis Obispo | Upgrade Price Canyon Road including construction of bikeway between San Luis Obispo and Pismo Beach | 0.8 | 1.7 | 49 |
San Luis Obispo | Construct pedestrian promenade, Pismo Beach | 0.2 | 0.5 | 30 |
San Luis Obispo | Reconstruct Grand Avenue between Elm Street and Halcyon Road, Grande | 0.4 | 1.9 | 20 |
San Luis Obispo | Rehabilitate Highway 1 in Guadalupe | 0.4 | 0.6 | 60 |
San Luis Obispo | Install call boxes along Highway 166 between intersections with Highway 101 and Junction with Highway 33 | 0.2 | 0.4 | 60 |
San Luis Obispo | Extend Route 46 expressway in San Luis Obispo County | 6.0 | 64.0 | 9 |
San Luis Obispo | Upgrade South Higuera Street, San Luis Obispo | 0.7 | 1.4 | 48 |
San Mateo | Construct I-380 connector between Sneath Lane and San Bruno Avenue, San Bruno | 2.1 | 5.5 | 38 |
San Mateo | Upgrade SR 92/El Camino interchange, San Mateo | 2.8 | 4.6 | 60 |
San Mateo | Construct tunnel with approaches as part of Devils Slide project in San Mateo County | 6.0 | 10.0 | 60 |
San Mateo | Undertake San Pedro Bridge project at SR 1, Pacifica | 1.1 | 1.9 | 60 |
Santa Barbara | Construct bikeways, Santa Maria | 0.4 | 0.6 | 60 |
Santa Barbara | Upgrade call boxes throughout Santa Barbara County | 1.1 | 1.9 | 60 |
Santa Barbara | Rehabilitate pavement throughout Santa Barbara County | 1.1 | 1.9 | 60 |
Santa Clara | Install Silicon Valley Smart Corridor project along the I-880 corridor | 2.2 | 6.1 | 35 |
Solano | Upgrade access road to Mare Island | 0.8 | 1.3 | 60 |
Solano | Improve and construct I-80 reliever route project; Walters Road and Walters Road Extension Segments | 2.4 | 9.3 | 25 |
Solano | Construct I-80 reliever route system, Solano County | 12.1 | ||
Sonoma | Widen U.S. 101 from Windsor to Arcata Interchange | 1.1 | 2.0 | 55 |
Sonoma | Widen U.S. 101 from Petaluma Bridge to Novato | 8.8 | 33.0 | 27 |
Sutter | Upgrade Highway 99 between State Highway 70 and Lincoln Road, Sutter County | 7.3 | 34.0 | 22 |
Tehama | Construct new I-95 interchange with Highway 99W, Tehama County | 2.2 | 2.2 | 100 |
Tulare | Conduct highway 65 improvement and mitigation project | 4.3 | 5.0 | 86 |
Tulare | Construct Tulare County roads in Tulare County | 6.8 | 11.3 | 60 |
Ventura | Construct bike paths, Thousand Oaks | 0.6 | 0.8 | 80 |
Ventura | Improve and modify the Port Hueneme Intermodal Corridor--Phase II in Ventura County | 16.8 | 33.0 | 51 |
Ventura | Improve streets and highways, and/or construct sound walls, Thousand Oaks | 1.3 | ||
Ventura | Improve streets and related bicycle lane in Oak Park, Ventura County | 0.5 | 1.1 | 41 |
Ventura | Widen SR 23 between Moorpark and Thousand Oaks | 10.5 | 39.0 | 27 |
Yolo | Construct connector between I-5 and SR 113 and reconstruct I-5 interchange with Road 102, Woodland | 11.5 | 11.5 | 100 |
GRAND TOTAL | $877.3 | |||