Results


2,245 results

Sort by date / relevance

[PDF] CalFire = California Department of Forestry and Fire Protection;

CalFire = California Department of Forestry and Fire Protection; FS = Fire Station; A = acquisition; HB = Helitack Base; W = working drawings; CC = Conservation Camp; P = preliminary plans; AAB = Air Attack Base; HQ = Headquarters; and C = construction.
https://lao.ca.gov/handouts/resources/2021/CalFire-020421.pdf

[PDF] Updated 2001 General Fund Revenue Projections

Hill Legislative Analyst cc: Paul Navarro, Chief Consultant
https://lao.ca.gov/2001/010601_cox_revenue_letter.pdf

2000 Budget Analysis: Res CC Land Acq

2000 Budget Analysis: Res CC Land Acq Analysis of the 2000-01 Budget Bill Land Acquisition Funding Administrative Funding Should Be Based on Anticipated Workload The budget proposes language for the Wildlife Conservation Board (WCB--Item 3640) and State Coastal Conservancy (SCC--Item 3760) that would allow those departments to use a portion of land acquisition and improvement funding for administrative costs.
https://lao.ca.gov/analysis_2000/resources/res_5_cc_land%20acq_anl00.htm

MOU Fiscal Analysis: Bargaining Unit 16 (Physicians, Dentists, and Podiatrists)

Jul 14, 2025 - The state and Unit 16 agreed to this prefunding arrangement in 2017 , with the fund expected to be fully funded for Unit 16 within 30 years. In 2025-26, the state and employees represented by Unit 16 each contribute 1.4 percent of pay to prefund the benefit for Unit 16 members.
https://lao.ca.gov/Publications/Report/5064

2000 Budget Analysis: Resources CC Fund Conditions

2000 Budget Analysis: Resources CC Fund Conditions aNet of transfer of $20.1 million to the Habitat Conservation Fund. Below we discuss in greater detail the funds shown in Figure 1. Resources Trust Fund.
https://lao.ca.gov/analysis_2000/resources/res_2_cc_anl00.htm

[PDF] Debt Service Information

Attachment cc: Hon. Darrell Steinberg Hon. Dave Cogdill Projected General Fund Debt Service Obligations Existing Bond Authorizations
https://lao.ca.gov/2009/stadm/debt_service/Debt_Service_Information_Memo_10_30_09.pdf

The 2020-21 Budget: Fresno Integrated K-16 Education Collaborative

Mar 11, 2020 - The 2020-21 Budget: Fresno Integrated K-16 Education Collaborative Fresno Integrated K-16 Education Collaborative Introduction In this post, we analyze the Governor ’s proposal to establish the Fresno Integrated K-16 Education Collaborative (the Collaborative).
https://lao.ca.gov/Publications/Report/4199

LAO Analysis of the 2011-12 Budget Conference Committee Tax Swap Proposal

Sincerely, Mac Taylor Legislative Analyst cc:   Hon. Darrell Steinberg, President pro Tempore of the Senate           Members of the Senate Revenue and Taxation Committee
https://lao.ca.gov/reports/2010/tax/tax_swap/tax_swap_081210.aspx

The 2024-25 Budget: Preliminary May Revision Analysis for Child Welfare

May 24, 2024 - Passing only what is necessary this year would allow more time for the remaining stakeholder questions and policy issues to be worked out and give the Legislature the chance to assess whether the rates structure is in line with its vision for permanent CC R rates.
https://lao.ca.gov/Publications/Report/4909

[PDF] The 2022-23 Budget: Clean Energy Package

The first phase would include 12 to 16 demonstration projects ranging from three megawatts (MW) to five MW of capacity. The second phase would include fewer projects— roughly seven to ten—but most projects would range from five MW to ten MW.
https://lao.ca.gov/reports/2022/4554/Clean-Energy-Package-022222.pdf