Results


1,707 results

Sort by date / relevance

[PDF] Farmers Field football stadium

Kevin de León 4 August 17, 2011 improvements near the site and ongoing operational costs for providing services to the proposed facilities.  Convention Center Dependent on Parking Revenue. As described in the city’s analysis, parking revenue is a significant source of LACC’s operating budget.
https://lao.ca.gov/reports/2011/stadm/letters/farmers_field_082611.pdf

[PDF] A Status Report: Implementing AB 900's Prison Construction and Rehabilitation Initiatives

In order to guide the planning for reentry facilities, CDCR recently de- signed a 500-bed prototype facility that it estimates will cost about $160 million to construct. Based on the department’s estimate, the $2.6 billion provided in AB 900 will support about half the number of reentry beds assumed in the measure.
https://lao.ca.gov/2009/crim/AB900/ab900_051409.pdf

LAO Publications

Format: AB32: Analysis of Two Studies by Varshney and Associates March 9, 2010 - This responds to Assembly Member De León's request relating to California’s regulatory environment and AB 32 (Núñez), the Global Warming Solutions Act of 2006 (Chapter 488, Statute s of 2006).
https://lao.ca.gov/Publications?page=6&year=0&publicationType=0&type=Other

[PDF] Family Cost Participation Program Expansion

Hector De La Torre Assembly Member, 50th District Room 4016, State Capitol Sacramento, California 95814 Dear Assembly Member De La Torre: In a letter dated March 31, 2009, you requested our assistance in determining the savings that could be achieved by expanding the Family Cost Participation Program (FCPP) and Parental Fee Programs (PFP) for Regional Center (RC) services.
https://lao.ca.gov/2009/hlth/fcpp/fcpp_042709.pdf

[PDF] Department of Health Services Toxic Substances Control Programs

The quarterly report documents that the Hazardous f·1ateri al s Laborntory exceeded the planned number of de terminations on samp l es hy 470 per~ent for site mitigation and 93 percent for surveill Rnce and enforcement.
https://lao.ca.gov/reports/1983/department_of_health_services_toxic_substance_control_program.pdf

[PDF] Supplemental Report Language Agenda, 2008-09 Budget Bill Conference Committee

This report shall be updated by the de- partment each year in which the state contracts for out-of-state facilities. Page 21 Item 5225-002-0001 Sort ASSEMBLY SENATE 1. None 1. California Department of Corrections and Rehabilitation—Dental Treat- ment and Rehabilitation Program Conflicts.
https://lao.ca.gov/handouts/Conf_Comm/2008/Supplemental_Report_Language_Agenda_2008.pdf

[PDF] Financial Assurances: Strengthening Public Safety of Waste Facilities and Surface Mines

Financial assurances are evidence to the state that the owner or operator of a waste site or surface mine has the financial resources to restore the site to a condition that poses no threat to public safety, public health, or the environment.
https://lao.ca.gov/2006/site_assurances/site_assurances_042606.pdf

[PDF] LAO 2003 Budget Analysis: Capital Outlay Chapter

These costs are to operate and maintain existing facilities; de- velop, operate and maintain additional facilities for which there is a cur- rent need; and develop, operate and maintain additional facilities for which a need is projected to develop in the future.
https://lao.ca.gov/analysis_2003/cap_outlay/co_anl03.pdf

LAO 2006 Budget Analysis: Department of Personnel Administration (8380)

Such a proposal would inclu de all of the components, including classification reform, needed to make the state’s civil service system more productive and efficient. After the administration and the Legislature agr ee on the principles and major components of a comprehensive reform effort, the hiring of consultants to help plan for implementation of the package might be more appropriate.
https://lao.ca.gov/analysis_2006/general_govt/gen_15_8380_anl06.html

In order to meet an April 2011 statutory deadline, the Employment Development Department proposes an interim parallel database solution for implementing an alternate base period.

May 10, 2010 - Essentially, the interim solution would de-link the two efforts. The department would  create a parallel UI/DI database  that utilizes modern technology and is  flexible enough to handle  ABP implementation.  
https://lao.ca.gov/Recommendations/Details/210