Publication Date

All

Current year

Past 5 years

 


 

Results


12 results

Sort by date / relevance

[PDF] The project includes replacement of two low-nitrogen oxide

The project includes replacement of two low-nitrogen oxide burner assemblies with flue gas recirculation, replacement of the refractory brick from the frontwall, backwall and north sidewall, installation of a continuous emission monitoring system, and modification of the control system for Boiler No. 4 to operate in conjunction with the new controls for Boiler Nos. 1, 2, and 3.
https://lao.ca.gov/1991/reports/0791_supplemental_report_of_the_1991_budget_act_1991-92_fiscal_year.pdf

[PDF] 1954 Budget Analysis: WATER RESOURCES BOARD

WATER PROJECT AUTHORITY SAN FRANCISCO BAY STUDY ON SALINITY CONTROL BARRIERS ITEM 262 of the Budget Bill Budget page 867 Budget lines Nos. 8 and 15 For San Francisco Bay Study on Salinity Control Barriers From the General Fund and Flood Control Fund of 1946 Amount requested ________________________________________ :...___ $250,000 Estimated to be expended in 1953-54 Fiscal
https://lao.ca.gov/analysis/1954/34_water_resources_1954.pdf

[PDF] 1955 Budget Analysis: Veterans Affairs

Department of Veterans Afi'ai,rs VETERANS' HOME ,ITEMS 267 and 268 of the Budget Bill Budgefpage938 Budget lines Nos. 7, 22 For Support of Veterans' Home From the General and Athletic Commission Funds .
https://lao.ca.gov/analysis/1955/22_veterans_1955.pdf

[PDF] 1957 Budget Analysis: Local Assistance

FLOOD CONTROL FUND OF 1946 ITEM 435 of the Budget Bill Budget page 1378 Budget line No. 60 FOR TRANSFER BY THE STATE CONTROLLER TO THE FLOOD CON- TROL FUND OF 1946 FROM THE GENERAL FUND Amount requested ______________________________________________ $11,993,590 Transferred in 1956-57 Fiscal year_______________________________ 5,184,110 Increase (131.4 percent)
https://lao.ca.gov/analysis/1957/26_local_assistance_1957.pdf

[PDF] 1956 Budget Analysis: Local Assistance

._____________ 5,184,110 Reduction _____________________________________________________ None ANALYSIS This item transfers the funds required for items Nos. 418 and 419 in the capital outlay section of the budget and items 437, 438, 439, 440 and 441 in the subventions section from the General Fund to the Flood Control Fund of 1946.
https://lao.ca.gov/analysis/1956/26_local_assistance_1956.pdf

[PDF] 1957 Budget Analysis: Resources

Department of Natural Resources DIVISION OF BEACHES AND PARKS ITE MS 179, 180 and 182 of the Budget Bill Budget pages 733 and 734 Budget line Nos. 58, 7 and 34 FOR SUPPORT OF DIVISION OF BEACHES AND PARKS FROM THE STATE PARK MAINTENANCE, STATE PARK AND STATE BEACH FUNDS - )cmount requested ______________________________________________ $5,331,754 Estimated to be expended in
https://lao.ca.gov/analysis/1957/17_resources_1957.pdf

Review of the Contract for an Automated Instant Ticket Gaming System

Response Please refer to our responses to Question Nos. 1 and 4 above. Question No. 6 The CSL is paying this $25 million in a lump sum at the front of the contract. Is that unusual? Is it, in your view, wise from a financial standpoint or a performance contractin g standpoint?
https://lao.ca.gov/1996/013196_ltr/ltr13196.html

[PDF] Proposed New Permanent Facilities Not Reviewed and Approved by

Proposed New Permanent Facilities Not Reviewed and Approved by the Legislature We withhold recommendation on Items 5240-301-723(9) and (10)~ $13.2 million for land acquisition~ EIR, initial studies~ plannin~ master planning and schematics for new medium-security facilities Nos. 1 and ~ pending receipt of adequate information for legislative review of the proposed new prisons.
https://lao.ca.gov/analysis/1982/09_corrections_1982.pdf

[PDF] 1985-86 Budget Analysis: Youth and Adult Correctional

Finally, the SPB report noted that the depart- ment is falling short of its affirmative action goals in reaching labor force parity among various groups, particularly among females, Asians, Filipi- nos, and the disabled.
https://lao.ca.gov/analysis/1985/09_corrections_1985.pdf