Results


382 results

Sort by date / relevance

The 2026-27 Budget: California Competes Extension

Mar 18, 2026 - Although the current baseline allocation for the program is $180  million per fiscal year, the actual value of credits available to be allocated can be enhanced in two main ways: First, credits that are recaptured can be reallocated in future years.
https://lao.ca.gov/Publications/Report/5162

2002 Budget Analysis: Judiciary and Criminal Justice, Department of Justice (0820)

The Division Is Slow in Processing Tribal Applications Of Key Personnel We recommend the enactment of legislation requiring the division to complete the background reviews for tribal license applications within 180 days.
https://lao.ca.gov/analysis_2002/crim_justice/cj_3_0820_anl02.htm

Early Education Annual Funding Rates by Rate System, Setting, and Age [EdBudget]

Dec 20, 2023 - Note: All rates reflect full-time, full-year care, with the exception of Transitional Kindergarten and State Preschool—part day, which operate at least 3 hours per day for 180 and 175 days per year respectively.
https://lao.ca.gov/Education/EdBudget/Details/804

[PDF] Water Security, Clean Drinking Water, Coastal and Beach Protection Act of 2002

Bill Lockyer 2 December 11, 2001 Figure 1 Water Security, Clean Drinking Water, Coastal And Beach Protection Act of 2002 Uses of Bond Funds (In Millions) Amount Coastal Protection $950 • Wetlands restoration in or near urban areas 750 • Watershed protection 200 CALFED Bay-Delta Program $825 • Water use efficiency and conservation 180 • Water supply reliability
https://lao.ca.gov/ballot/2001/011044_INT.pdf

[PDF] The California State Bar: Considerations for a Fee Increase

Similar to the State Bar, state law establishes a goal for CSLB to complete the investigation of cases within 180 days of the receipt of the complaint. The goal for complex fraud or contractual cases increases to 365 days.
https://lao.ca.gov/reports/2019/4080/state-bar-062619.pdf

[PDF] The Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006

Bill Lockyer 2 January 4, 2006 Figure 1 Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006 Uses of Bond Funds (In Millions) Amount Water Quality $1,525 • Integrated regional water management. 1,000 • Safe drinking water. 380 • Delta and agriculture water quality. 145 Protection of Rivers, Lakes and Streams $928 • Regional conservancies. 279
https://lao.ca.gov/ballot/2005/050936.pdf

Child Care and Preschool Funding Rates by Rate System, Setting, and Age [EdBudget]

Sep 18, 2019 - Child Care and Preschool Funding Rates by Rate System, Setting, and Age [EdBudget]     All rates reflect full-time, full-year care, with the exception of Transitional Kindergarten and State Preschool—part day, which operate part day for 180 and 175 days per year, respectively. a Rates are weighted by the number of subsidized children receiving child care in each setting and county.
https://lao.ca.gov/Education/EdBudget/Details/293

Child Care and Preschool Funding Rates by Rate System, Setting, and Age [EdBudget]

Jan 22, 2018 - Child Care and Preschool Funding Rates by Rate System, Setting, and Age [EdBudget]     Note: All rates reflect full-time, full-year care, with the exception of Transitional Kindergarten and State Preschool—part day, which operate part day for 180 and 175 days per year respectively. a Rates are weighted by the number of subsidized children receiving child care in each setting and county.
https://lao.ca.gov/Education/EdBudget/Details/106

Early Education Funding Rates by Rate System, Setting, and Age [EdBudget]

Jul 10, 2018 - Early Education Funding Rates by Rate System, Setting, and Age [EdBudget]     Notes: All rates reflect full-time, full-year care, with the exception of Transitional Kindergarten and State Preschool—part day, which operate at least 3 hours per day for 180 and 175 days per year respectively.
https://lao.ca.gov/Education/EdBudget/Details/166

Insurance regulation. [Ballot]

Nov 10, 2025 - The homeowner could ask for up to 180 days if there are delays outside their control . Increases Contents Coverage Payouts in the Event of Total Loss. If a homeowner experiences a “total loss, ” like their home burning down, an insurer must pay for the full amount for covered personal belongings without requiring a detailed list of the belongings.
https://lao.ca.gov/BallotAnalysis/Initiative/2025-020