Publication Date

All

Current year

Past 5 years

 


 

Subject Area
Transportation (21)
See all

Results in Transportation


21 results

Sort by date / relevance

The 2026-27 Budget: California Highway Patrol Proposals

Mar 6, 2026 - Many of the older area offices are also out of compliance with modern building requirements and therefore replacements need to be located on larger parcels than their current sites. These constraints can significantly narrow the number of qualified parcels, meaning the process of identifying and acquiring new sites for CHP office replacements can be difficult.
https://lao.ca.gov/Publications/Report/5152

The 2023-24 Budget: Proposed Fund Shift for CHP and DMV Capital Projects

Feb 27, 2023 - For example, as shown in Figure  1, the Governor now plans to submit future proposals to fund the design ‑build phase of five CHP projects with a total of $255  million in lease revenue bonds in 2024 ‑25 and the design ‑build phase of one DMV project with $62  million in lease revenue bonds in 2025 ‑26.
https://lao.ca.gov/Publications/Report/4710

The 2017-18 Budget: California Highway Patrol

Feb 9, 2017 - The CHP proposes to use the design-build procurement method and award a co ntract in 2018 ‑19 at an estimated cost of $31.9  million —for a total project cost of $34.1  million $30.4  million to fund the design-build phase of the El Centro area office replacement.
https://lao.ca.gov/Publications/Report/3551

The 2022-23 California Spending Plan: Transportation

Sep 29, 2022 - Design-Build Procurement Authority. Budget trailer legislation authorizes Caltrans to utilize design-build procurement for six additional projects in both 2022-23 and 2023-24. (Previously, Caltrans was only authorized to use design-build for ten projects over a limited period.)
https://lao.ca.gov/Publications/Report/4628

The 2025-26 California Spending Plan: Transportation

Oct 16, 2025 - Of this total, $7.8  million is from the General Fund and $2.3  million is supported by the Public Buildings Construction Fund (lease revenue bonds that will eventually need to be paid back with interest).
https://lao.ca.gov/Publications/Report/5077

The 2019-20 Budget: Transportation Proposals

Feb 26, 2019 - Specifically, the Governor ’s budget requests $ 133  m illion in Public Buildings Construction Fund authority as follows: El Centro. $41. 9  m illion from the Public Buildings Construction Fund for the design ‑build phase of the El Centro area office replacement.
https://lao.ca.gov/Publications/Report/3948

The 2018-19 Budget: Transportation Proposals

Feb 8, 2018 - The Governor ’s budget also proposes lease revenue bond authority to build a new office in Quincy. (The funding approved in the 2015 ‑ 16 b udget to build a new office in Quincy subsequently reverted due to difficulties acquiring a site.)
https://lao.ca.gov/Publications/Report/3745

Review of High-Speed Rail Draft 2016 Business Plan

Mar 17, 2016 - The HSRA plans to build Phase  I of the system in segments as funding becomes available. As discussed below, the authority has been planning since 2012 for the first segment to connect the Central Valley to the Los Angeles region.
https://lao.ca.gov/Publications/Report/3394

The 2017-18 Budget: Department of Transportation

Feb 14, 2017 - The Legislature will want to determine whether it concurs with the plan ’s goals to build publicly accessible electric vehicle charging stations, particularly in light of its priorities for limited state funding.
https://lao.ca.gov/Publications/Report/3560

The 2019-20 Budget: California Spending Plan—Transportation

Oct 17, 2019 - This total also includes $133  million from the Public Buildings Construction Fund for the design-build phase in San Bernardino ($42  million), El Centro ($41.9  million), and Hayward ($48.7  million).
https://lao.ca.gov/Publications/Report/4098