Results from the past 5 years


219 results

Sort by date / relevance

Tribal gaming. [Ballot]

Dec 27, 2021 - The specific levels of authority that DOJ and CGCC would have over each tribe w ould depend on the type of authorization the tribe received. For those under the state law framework, the measure authorizes CGCC to develop and implement various regulations —such as the types of bets that can be offered, licensing requirements, and consumer protection requirements.
https://lao.ca.gov/BallotAnalysis/Initiative/2021-039

Online sports wagering. [Ballot]

Oct 20, 2021 - Some or all of these costs w ould be offset by the increased revenue deposited into the COSBTF. Other Fiscal Effects. This measure could result in various other fiscal impacts on the state and local governments.
https://lao.ca.gov/BallotAnalysis/Initiative/2021-017

Updating the California Necessities Index

Aug 14, 2025 - Further, the difference between the CNI and the CA CPI ‑U and CA CPI ‑W is often large. Figure  2 shows differences between the proposed measures in each year since 1978. In about half of years, the CNI differed from the CA CPI ‑U and the CA CPI ‑W by at least 1  percentage point.
https://lao.ca.gov/Publications/Report/5065

Gaming. [Ballot]

Dec 18, 2023 - The actual magnitude of these effects, however, is uncertain and would depend on ho w the measure is interpreted and implemented. For example, currently pending litigation in another state could impact this measure.
https://lao.ca.gov/BallotAnalysis/Initiative/2023-030

The 2025-26 Budget: Community College Facilities

Mar 18, 2025 - Figure 3 Governor ’s Budget Funds New and Continuing CCC Capital Outlay Projects Bond Funds (In Thousands) Advanced transportation and manufacturing building replacement P, W Career technical education building replacement P, W New Library Learning Resource Center P, W Library Learning Resource Center and student services center replacement P,
https://lao.ca.gov/Publications/Report/5017

California State University Capital Outlay Projects [EdBudget]

Mar 26, 2026 - W = working drawings. C = construction. E = equipment. Subscribe | California State Legislature | Online Voter Registration | Privacy Policy | Accessibility Legislative Analyst's Office | The California Legislature's Nonpartisan Fiscal and Policy Advisor 925 L Street, Suite 1000 Sacramento, CA 95814 | (916) 445-4656
https://lao.ca.gov/Education/EdBudget/Details/1082

California Community Colleges Capital Outlay Projects [EdBudget]

Mar 10, 2026 - W = working drawings. PC = performance criteria. STEM = science, technology, engineering, and math. DB = design-build. Subscribe | California State Legislature | Online Voter Registration | Privacy Policy | Accessibility Legislative Analyst's Office | The California Legislature's Nonpartisan Fiscal and Policy Advisor 925 L Street, Suite 1000 Sacramento, CA 95814 | (916) 445-4656
https://lao.ca.gov/Education/EdBudget/Details/1025

May Revision Changes to California Community Colleges Capital Outlay Projects [EdBudget]

May 21, 2025 - W = working drawings. C = construction.      Subscribe | California State Legislature | Online Voter Registration | Privacy Policy | Accessibility Legislative Analyst's Office | The California Legislature's Nonpartisan Fiscal and Policy Advisor 925 L Street, Suite 1000 Sacramento, CA 95814 | (916) 445-4656
https://lao.ca.gov/Education/EdBudget/Details/974

The 2025-26 Budget: Understanding Recent Increases in the Medi-Cal Senior Caseload

Mar 6, 2025 - Figure  10 shows the average number of Medi ‑Cal enrollees over 65 who are enrolled in Medi ‑Cal for the first time in their lives in four selected time periods —before the continuous coverage period, during continuous coverage but before the asset test phase out, the asset test phase ‑out period, and finally after elimination of the asset test.
https://lao.ca.gov/Publications/Report/5010

The 2021-22 Budget: LAO Preliminary Comments on the May Revision Medi-Cal Budget

May 21, 2021 - Available budget documents do not indicate ( 1)  w hat kinds of agencies would be eligible to receive this funding, ( 2)  h ow the funding would be distributed, ( 3)  w hat capacity ‑building activities would be funded, and ( 4)  w hat the rationale for the proposed funding amount of $ 200  m illion total funds is.
https://lao.ca.gov/Publications/Report/4436